client: Municipal Corporation of Brihan Mumbai (MCBM)
location: Mumbai, India
project description:
R.V. Anderson Associates Limited in JV with a U.K. firm was responsible for the preparation of a Sewerage Master Plan for MCBM for period 2002-2005.
- Data collection and review of all recent studies and projects being implemented
- Reviewing of regional aspects and initiatives being taken by other agencies which will have an impact on Mumbai Region.
- Population assessment and future projections.
- Assessment of Water Supply, consumption (domestic and non-domestic) and impact on wastewater flows.
- Sewer Flow measurement surveys to estimate the current total wastewater flows being generated in Mumbai including measurement of flows in storm drains and assessment of infiltration.
- Preparation, customization of computer hydraulic model for modelling and predicting future flows, diurnal flow patterns for sizing new facilities.
- Wastewater sampling and treatability studies.
- Preparation, customization and updating of GIS Arc-Info Maps, surveying and locating related infrastructure on these maps and conducting GPS surveys.
- Pump efficiency testing at various Sewage pumping stations to identify opportunities for savings.
scope of work:
The master plan will cater to the needs of Mumbai until year 2025 with an estimated population of nearly 17 million people and a total sewage flow of nearly 2700 mld. |